Do You Have A Project We Can Help With?
Company Management Team
FTFD prides itself on its highly qualified and experienced staff, our management team is a blend of highly experienced people which consists of the following:
Supporting Team
FTFD has in the engineering and fabrication a very solid and supportive team which consists of the following:
Qualified Boiler Makers
Mechanical Fitters
Machine Operators
Crane Operators, Dogmen and Riggers, HR Operators
On Site Installers
Our Clients
Explore Recent Projects
Warren Weir Stop Boards
The project consisted of design and development, fabrication and installation of a stop board system to increase the weir height.
Ward Bros Non-rising Spindle Gate
Fast Track Fabrication and Design were engaged to design, develop, fabrication of an undershot non-rising spindle gate.
Norske Skog Albury Access Compliance
Fast Track Fabrication and Design were engaged under a large contract to design, draft, fabricate and install a range of access compliance solutions.
Newlyn Reservoir Bridge Structure
Design review, Drafting, manufacture of a new compliant bridge structure including civils to access from the reservoir bank to the outlet tower that was previously only accessible via boat.
Mulwala Foreshore Stairs
This project involved the drafting, fabrication and delivery of 5 sets of stairs for the upgrade of the Mulwala foreshore.
Maude Weir Access Upgrade
Design, development, fabrication and installation of a modular access system which allowed for complete modules to be transported to site.
Goulburn Murray Water SMC Radial Gates
Design, Drafting, Fabrication, removal of existing and installation of four replacement radial gates at Goulburn Murray Water, Goulburn Weir Stuart Murray Canal Offtake.
Gogeldrie Weir Walkway and Access
The project consisted of the design, drafting, fabrication and installation of a 90m long walkway attached to the piers of the existing weir structure.
Goulburn Valley Water access ladders and platforms
Goulburn Valley Water Access Ladders and Platforms Rectifications to AS1657-2013. Totalling 88 Assets.
Penstock gates
Penstock Gates, Design, Drafting, Fabrication and Installation on Sites. Total Gate supply 45 Gates.
Murrumbidgee weir structures
WHS Upgrades at Various Weir Structures in the Murrumbidgee Area. Survey Feature and Drones Used for Accurate measurement and location of the Stair Tower.
Get a quote
Fill in your details below along with the details of your job and we will reply within 24 hours on week days and on Monday if it’s the weekend.