Project Description
Gogeldrie Weir Walkway and Access
The project consisted of the design, drafting, fabrication and installation of a 90m long walkway attached to the piers of the existing weir structure. Allowing compliant access along the opposite side of the weir structure which was previously inaccessible.





Get a quote
Fill in your details below along with the details of your job and we will reply within 24 hours on week days and on Monday if it’s the weekend.